We’re finally underway on the stabilization of Rosetyme. We had to remove the back 25% of the house because of the fire damage. When we did, we exposed an interior foundation that wasn’t the strongest, so things started moving around.

Blake Riley (left) and Charles Fowler, P.E. looked at the back wall foundation on March 23.
This will delay the framers starting on the roof for a while, while the engineer designs a foundation wall to go under the back wall (below) that will stabilize the rear of the house.

Now it will be necessary for our engineer to design a foundation wall to replace these pilings along the north side of the house, so the roof plate will be straight.
If you would like more information about this project of the Abilene Preservation League, or would like to know how you can help, please email us.